Higher Education

West Kentucky Community & Technical College logo featuring Kentucky outline, sun rays, and text.

West Kentucky Community and Technical College’s Anderson Vocational Building


Mott Electric was selected as the prime contractor to replace the main service feeders from the substation into the vocational school building during the Christmas Holiday.


The project included the removal and replacement of all of the school’s major distribution equipment along with their associated power conductors and conduits. This project had a very tight deadline and a very large scope of work to be accomplished. Everything had to be accomplished during the Christmas break and operational for school to be back in session at the first of the year. Acquisition, delivery and installation of the distribution panels was pivotal to the success of this project. Everything had to be ordered correctly. Much time was spent with the owners and the engineers to make double sure that all of the new equipment would not only arrive on time but that it would fit in the limited space available. Once the gear was ordered, all of the old power systems were removed from the school and everything was prepped for the new gear. We had also prepared contingency plans to assure that the school was kept from freezing in the absence of power to the building. The project was a complete success and it was completed several days ahead of schedule. WKCTCS has used us on several projects and service calls ever since.